LLM VRAM Calculator — Can My GPU Run This Model?

Estimate how much VRAM an AI model (7B, 13B, 70B…) needs for inference. Pick a quantization and see which GPU fits.

Approx. VRAM required

4.2 GB

GPUVRAM
RTX 3060 / 407012 GB✓ Fits
RTX 4080 / T416 GB✓ Fits
RTX 4090 / 3090 / A500024 GB✓ Fits
RTX 509032 GB✓ Fits
A100 (40GB)40 GB✓ Fits
A100 / H100 (80GB)80 GB✓ Fits
Apple M-series 16GB11 GB✓ Fits
Apple M-series 32GB24 GB✓ Fits
Apple M-series 64GB50 GB✓ Fits
Apple M-series 128GB100 GB✓ Fits

Rough estimate: VRAM ≈ params × bytes/param × 1.2 (overhead). Long context and large batches add KV-cache VRAM; real needs vary by inference engine.

Share this calculation

The link keeps basic share tracking.

What does this tool do?

It estimates the approximate GPU memory (VRAM) needed to run a large language model (LLM) locally.

Enter the model size (billion parameters) and quantization; the tool computes required VRAM and shows whether common graphics cards fit.

How is VRAM calculated?

Rough formula: VRAM ≈ parameter count × bytes per parameter × 1.2 (overhead). FP16 weights use 2 bytes, 8-bit uses 1 byte, 4-bit uses half a byte each.

Example: a 7-billion-parameter model at 4-bit needs ≈ 7 × 0.5 × 1.2 ≈ 4.2 GB; at FP16 ≈ 16.8 GB. That is why quantization lets low-VRAM cards run larger models.

Why do context and batch matter?

The estimate above only covers the weights. Long context and large batches need extra VRAM for the KV-cache, which can be significant with very long prompts.

Real usage depends on the inference engine (llama.cpp, vLLM, Transformers) and on memory used by the OS and other apps. In practice, leave a 10–20% buffer.

How should the output be read?

The displayed value reflects the scenario defined by your selected inputs and assumptions.

Use the result together with risk, timing, cost, and alternative scenario analysis before final decisions.

Real-world example usage

Running two different input sets helps reveal which variable drives the result the most.

That comparison pattern improves planning quality and reduces early-stage estimation errors.

Why this is needed and known limitations

This kind of tool is useful for budgeting, quoting, pre-analysis, and communication clarity.

It should not replace professional review or official compliance checks for final high-impact decisions.

Was this tool helpful?